Nutley Retaining Wall
NUTLEY RETAINING WALL
This job involved ripping out an existing concrete wall and digging back the bank to install the new wall. We next dug and poured new concrete foundations along the perimeter of the new wall, and then constructed a concrete block wall as a support. We then began to lay the Indian sandstone tumbled walling blocks as the finished face for the wall, completing the top of the wall with soldier headings.